Risk Factors Dashboard
Once a year, publicly traded companies issue a comprehensive report of their business, called a 10-K. A component mandated in the 10-K is the ‘Risk Factors’ section, where companies disclose any major potential risks that they may face. This dashboard highlights all major changes and additions in new 10K reports, allowing investors to quickly identify new potential risks and opportunities.
View risk factors by ticker
Search filings by term
Risk Factors - RYES
-New additions in green
-Changes in blue
-Hover to see similar sentence in last filing
Risks Related to Our Business
Increased levels of volatility or a rapid destabilization of global economic conditions could have a material adverse effect on our operations and financial condition.
In recent years, global financial conditions have been characterized by increased volatility which has impacted many industries, including the mining industry. Global financial conditions are subject to sudden and rapid destabilization in response to current and future events, as governmental authorities may have limited resources to respond to such events. Global capital markets continue to experience increased volatility in response to global events such as the significant increase in the rate of inflation in recent years, and the effects of certain countermeasures taken by central banks including increased interest rates. Future economic crises may be precipitated by any number of causes, including natural disasters, epidemics (such as the COVID-19 virus pandemic), geopolitical instability and war (such as the Russian invasion of Ukraine and the Israel-Palestine conflict), the failure of financial institutions, terrorism, material changes in the price of oil, the volatility of metal prices, and the volatility of global financial markets. Future economic crises may be precipitated by any number of causes, including natural disasters, epidemics (such as the COVID-19 virus pandemic), geopolitical instability and war (such as the Russian invasion of Ukraine and the current escalating Israel-Palestine conflict), the failure of financial institutions, terrorism, material changes in the price of oil, the volatility of metal prices, and the volatility of global financial markets. Continued increased levels of volatility or a sudden or rapid destabilization of global economic conditions could negatively impact our ability to obtain equity or debt financing or to make other suitable arrangements to finance our Idaho-Maryland Mine Project which, in turn, could have a material adverse effect on our operations and financial condition.
- 8 -
Our ability to continue to operate as a going concern depends on our ability to obtain adequate financing in the future.
The ability of the Company to continue as a going concern is dependent on the Company's ability to maintain continued support from its shareholders and creditors and to raise additional capital and implement its business plan.
There is no assurance that the Company will be able to obtain adequate financing in the future or that such financing will be on terms advantageous to the Company. - 8 - There is no assurance that the Company will be able to obtain adequate financing in the future or that such financing will be on terms advantageous to the Company. However, management believes that the Company can raise sufficient working capital to meet its projected minimum financial obligations for the next fiscal year. The accompanying financial statements have been prepared under the assumption that we will continue as a going concern. We are an exploration stage company and we have incurred losses since our inception.
We will require significant additional capital to fund our business plan. We will require significant additional capital to fund our business plan.
We will be required to expend significant funds to determine whether proven and probable mineral reserves exist at our properties, to continue exploration and, if warranted, to develop our existing properties, and to identify and acquire additional properties to diversify our property portfolio. We will be required to expend significant funds to determine whether proven and probable mineral reserves exist at our properties, to continue exploration and, if warranted, to develop our existing properties, and to identify and acquire additional properties to diversify our property portfolio. We anticipate that we will be required to make substantial capital expenditures for the continued exploration and, if warranted, development of our I-M Mine Property. We have spent and will be required to continue to expend significant amounts of capital for drilling, geological, and geochemical analysis, assaying, permitting, and feasibility studies with regard to the results of our exploration at our I-M Mine Property. We may not benefit from some of these investments if we are unable to identify commercially exploitable mineral reserves.
In addition, the Company may incur significant legal costs going forward should it decide to litigate in pursuit of protecting its property rights under both California state and US federal laws, including asserting its 5th Amendment rights under the US Constitution and other due process rights under the 14th Amendment of the U.S. Constitution, amongst other legal remedies that are available to the Company.
Our ability to obtain necessary funding for these purposes, in turn, depends upon a number of factors, including the status of the national and worldwide economy and the price of metals. Our ability to obtain necessary funding for these purposes, in turn, depends upon a number of factors, including the status of the national and worldwide economy and the price of metals. Capital markets worldwide were adversely affected by substantial losses by financial institutions, caused by investments in asset-backed securities and remnants from those losses continue to impact the ability for us to raise capital. We may not be successful in obtaining the required financing or, if we can obtain such financing, such financing may not be on terms that are favorable to us. We may not be successful in obtaining the required financing or, if we can obtain such financing, such financing may not be on terms that are favorable to us.
Our inability to access sufficient capital for our operations could have a material adverse effect on our financial condition, results of operations, or prospects. Our inability to access sufficient capital for our operations could have a material adverse effect on our financial condition, results of operations, or prospects. Sales of substantial amounts of securities may have a highly dilutive effect on our ownership or share structure. Sales of a large number of shares of our common stock in the public markets, or the potential for such sales, could decrease the trading price of those shares and could impair our ability to raise capital through future sales of common stock. We have not yet commenced commercial production at any of our properties and, therefore, have not generated positive cash flows to date and have no reasonable prospects of doing so unless successful commercial production can be achieved at our I-M Mine Property. We expect to continue to incur negative investing and operating cash flows until such time as we enter into successful commercial production. This will require us to deploy our working capital to fund such negative cash flow and to seek additional sources of financing. There is no assurance that any such financing sources will be available or sufficient to meet our requirements. There is no assurance that we will be able to continue to raise equity capital or to secure additional debt financing, or that we will not continue to incur losses.
- 9 -
We have a limited operating history on which to base an evaluation of our business and prospects.
Since our inception, we have had no revenue from operations. Since our inception, we have had no revenue from operations. We have no history of producing products from any of our properties. Our Idaho-Maryland Mine Project is a historic, past-producing mine which, apart from the exploration work that we have completed since 2016, has had very little recent exploration work since 1956. We would require further exploration work in order to reach the development stage. Advancing our I-M Mine Property into the development stage will require significant capital and time, and successful commercial production from the I-M Mine Property will be subject to completing feasibility studies, permitting and re-commissioning of the mine, constructing processing plants, and other related works and infrastructure. As a result, we are subject to all of the risks associated with developing and establishing new mining operations and business enterprises including:
- completion of feasibility studies to verify reserves and commercial viability, including the ability to find sufficient ore reserves to support a commercial mining operation;
- the timing and cost, which can be considerable, of further exploration, preparing feasibility studies, permitting and construction of infrastructure, mining and processing facilities;
- the availability and costs of drill equipment, exploration personnel, skilled labor, and mining and processing equipment, if required;
- the availability and cost of appropriate smelting and/or refining arrangements, if required;
- compliance with stringent environmental and other governmental approval and permit requirements;
- the availability of funds to finance exploration, development, and construction activities, as warranted;
- potential opposition from non-governmental organizations, local groups or local inhabitants that may delay or prevent development activities;
- potential increases in exploration, construction, and operating costs due to changes in the cost of fuel, power, materials, and supplies; and
- potential shortages of mineral processing, construction, and other facilities related supplies.
The costs, timing, and complexities of exploration, development, and construction activities may be increased by the location of our properties and demand by other mineral exploration and mining companies. The costs, timing, and complexities of exploration, development, and construction activities may be increased by the location of our properties and demand by other mineral exploration and mining companies. It is common in exploration programs to experience unexpected problems and delays during drill programs and, if commenced, development, construction, and mine start-up. In addition, our management and workforce will need to be expanded, and sufficient support systems for our workforce will have to be established. This could result in delays in the commencement of mineral production and increased costs of production. Accordingly, our activities may not result in profitable mining operations, and we may not succeed in establishing mining operations or profitably producing metals at any of our current or future properties, including our I-M Mine Property.
We have a history of losses and expect to continue to incur losses in the future. We have a history of losses and expect to continue to incur losses in the future.
We have incurred losses since inception, have had negative cash flow from operating activities, and expect to continue to incur losses in the future. We have incurred losses since inception, have had negative cash flow from operating activities, and expect to continue to incur losses in the future. We have incurred the following losses from operations during each of the following periods:
- $3,565,631 for the year ended July 31, 2024
- $3,660,382 for the year ended July 31, 2023
- $3,464,127 for the year ended July 31, 2022
- $1,603,878 for the year ended July 31, 2021
- 10 -
We expect to continue to incur losses unless and until such time as one of our properties enters into commercial production and generates sufficient revenues to fund continuing operations. We recognize that if we are unable to generate significant revenues from mining operations and/or dispositions of our properties, we will not be able to earn profits or continue operations. At this early stage of our operation, we also expect to face the risks, uncertainties, expenses, and difficulties frequently encountered by companies at the start-up stage of their business development. We cannot be sure that we will be successful in addressing these risks and uncertainties and our failure to do so could have a materially adverse effect on our financial condition.
Damage to our reputation could adversely affect our company's operations and financial condition. - 10 - Damage to our reputation could adversely affect our company's operations and financial condition.
Our relationship with the communities where we operate is critical to ensure the future success of our existing operations and the construction and development of our I-M Mine Property. Reputational damage can be the result of the actual or perceived occurrence of any number of events, and could include any negative publicity, whether true or not. There is an increasing level of public concern relating to the perceived effect of mining activities on the environment and on communities impacted by such activities. Certain individuals and groups who oppose resource development can often be vocal critics of the mining industry and its practices, including the use of hazardous substances in processing activities and effects on the environment. The increased use of social media and other web-based tools used to generate, publish and discuss user-generated content and to connect with other users has made it increasingly easier for such individuals and groups to communicate and share their opinions and views regarding our company and our activities. Adverse publicity generated by such persons related to extractive industries generally, or our operations or development activities specifically, could have an adverse effect on our reputation. Reputation loss, including reputation loss by other similar mining companies, may result in decreased investor confidence, increased challenges in developing and maintaining community and stakeholder relations and an impediment to our overall ability to advance our I-M Mine Property (including our ability to obtain permits), which could have a material adverse impact on our results of operations, financial condition and prospects. While we are committed to operating in a socially responsible manner, there is no guarantee that our efforts in this respect will mitigate this potential risk. We do not ultimately have direct control over how we are perceived by others and reputational damage could adversely affect our operations and financial condition.
We rely on information systems that may become subject to security threats.
We have entered into agreements with third parties for hardware, software, telecommunications and other information technology ("IT") services in connection with our operations. Our operations depend, in part, on how well we and our suppliers protect networks, equipment, IT systems and software against damage from a number of threats, including, but not limited to, cable cuts, natural disasters, terrorism, fire, power loss, hacking, phishing schemes, computer viruses, vandalism, fraud and theft. Our operations also depend on the timely maintenance, upgrade and replacement of networks, equipment, IT systems and software, as well as preemptive interventions and expenditures to mitigate the risks of failures and other IT system disruptions. Any of these and other events could result in information systems failures, delays and increases in capital expenses and which would negatively impact the Company's ability to operate. The failure of any part of our information systems could, depending on the nature and degree of any such failure, adversely impact our reputation and results of operations. Our risk and exposure to these matters cannot be fully mitigated because of, among other things, the evolving nature of these threats. As a result, cybersecurity and the continued development and enhancement of controls, processes and practices designed to protect our systems, computers, software, data and networks from attack, damage or unauthorized access remain a priority. As cyber threats continue to evolve, we may be required to expend additional resources to continue to modify or enhance protective measures or to investigate and remediate any security vulnerabilities.
- 11 -
Increasing attention to environmental, social, and governance (ESG) matters may impact our business.
Increasing attention to ESG matters, including those related to climate change and sustainability, and increasing societal, investor and legislative pressure on companies to address ESG matters may result in increased costs, increased investigations and litigation or threats thereof, negative impacts on our stock price and access to capital markets, and damage to our reputation. Increasing attention to ESG matters, including those related to climate change and sustainability, and increasing societal, investor and legislative pressure on companies to address ESG matters may result in increased costs, increased investigations and litigation or threats thereof, negative impacts on our stock price and access to capital markets, and damage to our reputation. Increasing attention to climate change, for example, may result in additional governmental investigations and private litigation, or threats thereof, against our company. In addition, some organizations that provide information to investors on corporate governance and related matters have developed ratings processes for evaluating companies on their approach to ESG matters, including climate change and climate-related risks. Such ratings are used by some investors to inform their investment and voting decisions. Unfavorable ESG ratings may lead to negative investor sentiment toward our company and to the diversion of investment to other industries, which could have a negative impact on our stock price and our access to and costs of capital. Additionally, evolving expectations on various ESG matters, including biodiversity, waste, and water, may increase costs, require changes in how we operate and lead to negative stakeholder sentiment.
Risks Related to Mining and Exploration
The I-M Mine Property is in the exploration stage. There is no assurance that we can establish the existence of any mineral reserve on the I-M Mine Property or any other properties we may acquire in commercially exploitable quantities. Unless and until we do so, we cannot earn any revenues from these properties and if we do not do so we will lose all of the funds that we expend on exploration. If we do not establish the existence of any mineral reserve in a commercially exploitable quantity, the exploration component of our business could fail.
We have not established that any of our mineral properties contain any mineral reserve according to recognized reserve guidelines, nor can there be any assurance that we will be able to do so.
A mineral reserve is defined in subpart 1300 of Regulation S-K under the Securities Act of 1933, as amended (the "Securities Act") and the Exchange Act ("Subpart 1300") as an estimate of tonnage and grade or quality of "indicated mineral resources" and "measured mineral resources" (as those terms are defined in Subpart 1300) that, in the opinion of a "qualified person" (as defined in Subpart 1300), can be the basis of an economically viable project. - 11 - A mineral reserve is defined in subpart 1300 of Regulation S-K under the Securities Act of 1933, as amended (the "Securities Act") and the Exchange Act ("Subpart 1300") as an estimate of tonnage and grade or quality of "indicated mineral resources" and "measured mineral resources" (as those terms are defined in Subpart 1300) that, in the opinion of a "qualified person" (as defined in Subpart 1300), can be the basis of an economically viable project. In general, the probability of any individual prospect having a "reserve" that meets the requirements of Subpart 1300 is small, and our mineral properties may not contain any "reserves" and any funds that we spend on exploration could be lost. Even if we do eventually discover a mineral reserve on one or more of our properties, there can be no assurance that they can be developed into producing mines and that we can extract those minerals. Both mineral exploration and development involve a high degree of risk, and few mineral properties that are explored are ultimately developed into producing mines.
The commercial viability of an established mineral deposit will depend on a number of factors including, by way of example, the size, grade, and other attributes of the mineral deposit, the proximity of the mineral deposit to infrastructure such as processing facilities, roads, rail, power, and a point for shipping, government regulation, and market prices. Most of these factors will be beyond our control, and any of them could increase costs and make extraction of any identified mineral deposit unprofitable.
- 12 -
The nature of mineral exploration and production activities involves a high degree of risk and the possibility of uninsured losses.
Exploration for and the production of minerals is highly speculative and involves greater risk than many other businesses. Most exploration programs do not result in mineralization that may be of sufficient quantity or quality to be profitably mined. Our operations are, and any future development or mining operations we may conduct will be, subject to all of the operating hazards and risks normally incidental to exploring for and development of mineral properties, such as, but not limited to:
- economically insufficient mineralized material;
- fluctuation in production costs that make mining uneconomical;
- labor disputes;
- unanticipated variations in grade and other geologic problems;
- environmental hazards;
- water conditions;
- difficult surface or underground conditions;
- industrial accidents;
- metallurgic and other processing problems;
- mechanical and equipment performance problems;
- failure of dams, stockpiles, wastewater transportation systems, or impoundments;
- unusual or unexpected rock formations; and
- personal injury, fire, flooding, cave-ins and landslides.
Any of these risks can materially and adversely affect, among other things, the development of properties, production quantities and rates, costs and expenditures, potential revenues, and production dates. Any of these risks can materially and adversely affect, among other things, the development of properties, production quantities and rates, costs and expenditures, potential revenues, and production dates. If we were to determine that capitalized costs associated with any of our mineral interests are not likely to be recovered, we would incur a write-down of our investment in these interests. All of these factors may result in losses in relation to amounts spent that are not recoverable, or that result in additional expenses.
Commodity price volatility could have dramatic effects on the results of operations and our ability to execute our business plan. - 12 - Commodity price volatility could have dramatic effects on the results of operations and our ability to execute our business plan.
The price of commodities varies daily. The price of commodities varies daily. Our future revenues, if any, will likely be derived from the extraction and sale of base and precious metals. The price of those commodities has fluctuated widely, particularly in recent years, and is affected by numerous factors beyond our control, including economic and political trends, expectations of inflation, currency exchange fluctuations, interest rates, global and regional consumptive patterns, speculative activities and increased production due to new extraction developments and improved extraction and production methods. The effect of these factors on the price of base and precious metals, and therefore the economic viability of our business, could negatively affect our ability to secure financing or our results of operations.
Estimates of mineralized material and resources are subject to evaluation uncertainties that could result in project failure. Estimates of mineralized material and resources are subject to evaluation uncertainties that could result in project failure.
Our exploration and future mining operations, if any, are and would be faced with risks associated with being able to accurately predict the quantity and quality of mineralized material and resources/reserves within the earth using statistical sampling techniques. Our exploration and future mining operations, if any, are and would be faced with risks associated with being able to accurately predict the quantity and quality of mineralized material and resources/reserves within the earth using statistical sampling techniques. Estimates of any mineralized material or resource/reserve on any of our properties would be made using samples obtained from appropriately placed trenches, test pits, underground workings, and intelligently designed drilling. There is an inherent variability of assays between check and duplicate samples taken adjacent to each other and between sampling points that cannot be reasonably eliminated. Additionally, there also may be unknown geologic details that have not been identified or correctly appreciated at the current level of accumulated knowledge about our properties. This could result in uncertainties that cannot be reasonably eliminated from the process of estimating mineralized material and resources/reserves. If these estimates were to prove to be unreliable, we could implement an exploitation plan that may not lead to commercially viable operations in the future.
- 13 -
Any material changes in mineral resource/reserve estimates and grades of mineralization will affect the economic viability of placing a property into production and a property's return on capital.
As we have not completed feasibility studies on our I-M Mine Property and have not commenced actual production, we do not have mineral resources and any estimates may require adjustments or downward revisions. As we have not completed feasibility studies on our I-M Mine Property and have not commenced actual production, we do not have mineral resources and any estimates may require adjustments or downward revisions. In addition, the grade of ore ultimately mined, if any, may differ from that indicated by future feasibility studies and drill results. Minerals recovered in small scale tests might not be duplicated in large scale tests under on-site conditions or in production scale.
Our exploration activities on our properties may not be commercially successful, which could lead us to abandon our plans to develop our properties and our investments in exploration. Our exploration activities on our properties may not be commercially successful, which could lead us to abandon our plans to develop our properties and our investments in exploration.
Our long-term success depends on our ability to identify mineral deposits on our I-M Mine Property and other properties we may acquire, if any, that we can then develop into commercially viable mining operations. Our long-term success depends on our ability to identify mineral deposits on our I-M Mine Property and other properties we may acquire, if any, that we can then develop into commercially viable mining operations. Mineral exploration is highly speculative in nature, involves many risks, and is frequently non-productive. These risks include unusual or unexpected geologic formations, and the inability to obtain suitable or adequate machinery, equipment, or labor. The success of commodity exploration is determined in part by the following factors:
- the identification of potential mineralization;
- availability of government-granted exploration permits;
- the quality of our management and our geological and technical expertise; and
- the capital available for exploration and development work.
Substantial expenditures are required to establish proven and probable reserves through drilling and analysis, to develop metallurgical processes to extract metal, and to develop the mining and processing facilities and infrastructure at any site chosen for mining. - 13 - Substantial expenditures are required to establish proven and probable reserves through drilling and analysis, to develop metallurgical processes to extract metal, and to develop the mining and processing facilities and infrastructure at any site chosen for mining. Whether a mineral deposit will be commercially viable depends on a number of factors that include, without limitation, the particular attributes of the deposit, such as size, grade, and proximity to infrastructure; commodity prices; and government regulations, including, without limitation, regulations relating to prices, taxes, royalties, land tenure, land use, importing and exporting of minerals, and environmental protection. We may invest significant capital and resources in exploration activities and may find it necessary to abandon such investments if we are unable to identify commercially exploitable mineral reserves. The decision to abandon a project may have an adverse effect on the market value of our securities and the ability to raise future financing.
We are subject to significant governmental regulations that affect our operations and costs of conducting our business and may not be able to obtain all required permits and licenses to place our properties into production. We are subject to significant governmental regulations that affect our operations and costs of conducting our business and may not be able to obtain all required permits and licenses to place our properties into production.
We believe that mining operations on the I-M Mine Property are a vested use, protected under the California and federal Constitutions, and that a use permit is not required for mining operations to continue. The Company owns the I-M Mine Property, consisting of 175 acres of surface land and a 2,560 acre mineral estate, located in the County. Before the I-M Mine Property was consolidated into its current configuration in 1941, it existed as multiple historical mines and operations.
- 14 -
For the vested right to be recognized by the County, the Company needs to demonstrate that mine operations were being conducted both before and immediately after the County first required a permit to mine in 1954. The Petition and its exhibits are replete with historical evidence that mining was conducted at the I-M Mine Property prior to, during, and after 1954, when the County first required a use permit.
Once vested, this right to mine endures unless it is abandoned, which the Company contends has not occurred. Abandonment only occurs if two conditions are met: (1) there is evidence of a property owner's actual intent to abandon the vested mining right; and (2) an overt act (or failure to act) demonstrating such intent. The California Supreme Court has held that a vested mining right is not abandoned merely because the mine has been inactive for periods of time, and the Court has found that cessation of use alone does not constitute abandonment of a mine. The evidence set out in the Petition establishes the various previous owners evidenced their intent to retain the vested right to mine by continuously recording mineral reservations, entering into leases, and making plans for resuming mining in the future, even when mining operations were suspended. There is no evidence that any owner of the I-M Mine Property intended to abandon the vested mining right or took an overt act demonstrating that intent (let alone both). We are subject to the vested rights being confirmed by the County. On September 6, 2023, the Company submitted a Petition to the County asserting its vested right to mine at the I-M Mine Property. The Board of Supervisors held a public hearing regarding the Company's Petition on December 13 and 14, 2023. The Board of Supervisors denied recognition of the Company's assertion of its vested right. There is no assurance that the Courts to which we propose to appeal this determination will recognize the Company's rights.
As previously applied by the Company, under the Use Permit process, the Company's operations, including exploration and, if warranted, development of the I-M Mine Property, require permits from governmental authorities and will be governed by laws and regulations, including:
- laws and regulations governing mineral concession acquisition, prospecting, development, mining, and production;
- laws and regulations related to exports, taxes, and fees;
- labor standards and regulations related to occupational health and mine safety; and
- environmental standards and regulations related to waste disposal, toxic substances, land use reclamation, and environmental protection.
Companies engaged in exploration activities often experience increased costs and delays in production and other schedules as a result of the need to comply with applicable laws, regulations, and permits. - 14 - Companies engaged in exploration activities often experience increased costs and delays in production and other schedules as a result of the need to comply with applicable laws, regulations, and permits. Failure to comply with applicable laws, regulations, and permits may result in enforcement actions, including the forfeiture of mineral claims or other mineral tenures, orders issued by regulatory or judicial authorities requiring operations to cease or be curtailed, and may include corrective measures requiring capital expenditures, installation of additional equipment, or costly remedial actions. We cannot predict if all permits that we may require for continued exploration, development, or construction of mining facilities and conduct of mining operations will be obtainable on reasonable terms, if at all. Costs related to applying for and obtaining permits and licenses may be prohibitive and could delay our planned exploration and development activities. We may be required to compensate those suffering loss or damage by reason of our mineral exploration or our mining activities, if any, and may have civil or criminal fines or penalties imposed for violations of, or our failure to comply with, such laws, regulations, and permits.
- 15 -
Existing and possible future laws, regulations, and permits governing operations and activities of exploration companies, or more stringent implementation of such laws, regulations and permits, could have a material adverse impact on our business and cause increases in capital expenditures or require abandonment or delays in exploration. Our I-M Mine Property is located in California, which has numerous clearly defined regulations with respect to permitting mines, which could potentially impact the total time to market for the project.
Subsurface mining is allowed in the County M1 Zoning District, where the I-M Mine Property is located, with approval of a "Use Permit". Subsurface mining is allowed in the County M1 Zoning District, where the I-M Mine Property is located, with approval of a "Use Permit". Approval of a Use Permit for mining operations requires a public hearing before the County Planning Commission, whose decision may be appealed to the Board of Supervisors. Use Permit approvals include conditions of approval, which are designed to minimize the impact of conditional uses on neighboring properties.
On November 21, 2019, the Company submitted an application for a Use Permit to the County. On November 21, 2019, the Company submitted an application for a Use Permit to the County. On April 28, 2020, with a vote of 5-0, the Board of Supervisors approved the contract for Raney to prepare an EIR and conduct contract planning services on behalf of the County for the proposed Idaho-Maryland Mine Project. The Planning Commission held a public hearing on May 10 and May 11, 2023 to consider the FEIR. At the conclusion of the public hearing, the Planning Commission recommended to the Board of Supervisors that the FEIR not be certified and that the Use Permit be denied.
On February 20, 2024, the Company announced that the Nevada County Board of Supervisors adopted a resolution in a public hearing on February 16, 2024 (the "Hearing"), denying the Company's application for a Use Permit to allow the re-opening of the Idaho Maryland Gold Mine and not certifying the Final Environmental Impact Report.
The Use Permit application proposes underground mining to recommence at the I-M Mine Property at an average throughput of 1,000 tons per day. The Use Permit application proposes underground mining to recommence at the I-M Mine Property at an average throughput of 1,000 tons per day. The existing Brunswick Shaft, which extends to ~3400 feet depth below surface, would be used as the primary rock conveyance from the I-M Mine Property. A second service shaft would be constructed by raising from underground to provide for the conveyance of personnel, materials, and equipment. Processing would be done by gravity and flotation to produce gravity and flotation gold concentrates.
We propose to produce barren rock from underground tunneling and sand tailings as part of the project which would be used for creation of approximately 58 acres of level and useable industrial zoned land for future economic development in the County. We propose to produce barren rock from underground tunneling and sand tailings as part of the project which would be used for creation of approximately 58 acres of level and useable industrial zoned land for future economic development in the County. A water treatment plant and pond, using conventional processes, would ensure that groundwater pumped from the mine is treated to regulatory standards before being discharged to the local waterways. There is no assurance our Use Permit application will be accepted as submitted. If substantial revisions are required, our ability to execute our business plan will be further delayed.
In 1975, the California Legislature enacted the Surface Mining and Reclamation Act ("SMARA"), which required that all surface mining operations in California have approved reclamation plans and financial assurances. - 15 - In 1975, the California Legislature enacted the Surface Mining and Reclamation Act ("SMARA"), which required that all surface mining operations in California have approved reclamation plans and financial assurances. SMARA was adopted to ensure that land used for mining operations in California would be reclaimed post-mining to a useable condition. Pursuant to SMARA, we would be required to obtain approval of a Reclamation Plan from and provide financial assurances to the County for any surface component of the underground mining operation before mining operations could commence. Approval of a Reclamation Plan will require a public hearing before the Planning Commission.
To approve a Reclamation Plan and Use Permit, the County would need to satisfy the requirements of California Environmental Quality Act ("CEQA"). To approve a Reclamation Plan and Use Permit, the County would need to satisfy the requirements of California Environmental Quality Act ("CEQA"). CEQA requires that public agency decision makers study the environmental impacts of any discretionary action, disclose the impacts to the public, and minimize unavoidable impacts to the extent feasible. CEQA is triggered whenever a California governmental agency is asked to approve a "discretionary project". The approval of a Reclamation Plan is a "discretionary project" under CEQA. Other necessary ancillary permits like the California Department of Fish and Wildlife ("CDFW") Streambed Alteration Agreement (if applicable) also triggers CEQA compliance.
- 16 -
In this situation, the lead agency for the purposes of CEQA would be the County. Other public agencies in charge of administering specific legislation will also need to approve aspects of the Project, such as the CDFW (the California Endangered Species Act), the Air Pollution Control District (Authority to Construct and Permit to Operate), and the Regional Water Quality Control Board (National Pollutant Discharge Elimination System (authorized to state governments by the US Environmental Protection Agency) and Report of Waste Discharge). However, CEQA's Guidelines provide that if more than one agency must act on a project, the agency that acts first is generally considered the lead agency under CEQA. All other agencies are considered "responsible agencies." Responsible agencies do need to consider the environmental document approved by the lead agency, but they will usually accept the lead agency's document and use it as the basis for issuing their own permits. There is no assurance that other agencies will not require additional assessments in their decision-making process. If such assessments are required, additional time and costs will delay the execution of, and may even require us to re-evaluate the feasibility of, our business plan.
Our activities are subject to environmental laws and regulations that may increase our costs of doing business and restrict our operations. Our activities are subject to environmental laws and regulations that may increase our costs of doing business and restrict our operations.
All phases of our operations are subject to environmental regulation in the jurisdictions in which we operate. All phases of our operations are subject to environmental regulation in the jurisdictions in which we operate. Environmental legislation is evolving in a manner that may require stricter standards and enforcement, increased fines and penalties for non-compliance, more stringent environmental assessments of proposed projects, and a heightened degree of responsibility for companies and their officers, directors, and employees. These laws address emissions into the air, discharges into water, management of waste, management of hazardous substances, protection of natural resources, antiquities and endangered species, and reclamation of lands disturbed by mining operations. Compliance with environmental laws and regulations, and future changes in these laws and regulations, may require significant capital outlays and may cause material changes or delays in our operations and future activities. It is possible that future changes in these laws or regulations could have a significant adverse impact on our properties or some portion of our business, causing us to re-evaluate those activities at that time.
Regulations and pending legislation governing issues involving climate change and our obligation to monitor and report on how our operations may impact climate change could result in increased operating costs, which could have a material adverse effect on our business. - 16 - Regulations and pending legislation governing issues involving climate change and our obligation to monitor and report on how our operations may impact climate change could result in increased operating costs, which could have a material adverse effect on our business.
A number of governments or governmental bodies have introduced or are contemplating legislative and/or regulatory changes in response to concerns about the potential impact of climate change. A number of governments or governmental bodies have introduced or are contemplating legislative and/or regulatory changes in response to concerns about the potential impact of climate change. Legislation and increased regulation regarding climate change could impose significant costs on us, on our future venture partners, if any, and on our suppliers, including costs related to increased energy requirements, capital equipment, environmental monitoring and reporting, and other costs necessary to comply with such regulations. Many governments and other stakeholders are seeking enhanced disclosure and are moving to enact climate change legislation and treaties at the international, national, state, provincial and local levels. In the United States, the U.S. Securities and Exchange Commission (the "SEC") has proposed climate-related disclosure rules: "The Enhancement and Standardization of Climate-Related Disclosures for Investors". In Canada, the Canadian Securities Administrators have proposed their own climate-related disclosure rules in National Instrument 51-107 - Disclosure of Climate-related Matters. The International Sustainability Standards Board has two proposed international standards for disclosure ("General Requirements for Disclosure of Sustainability Related Information" and "Climate Related Disclosures") which were developed to provide a global baseline of financial reporting disclosure rules for reporting environmental, social and governance (ESG) related issues. Any adopted future climate change regulations and our obligations to report on them could also negatively impact our ability to compete with companies situated in areas not subject to such limitations. Given the emotional and political significance and uncertainty surrounding the impact of climate change and how it should be dealt with, we cannot predict how legislation and regulation will ultimately affect our financial condition, operating performance, and ability to compete. Furthermore, even without such regulation, increased awareness and any adverse publicity in the global marketplace about potential impacts on climate change by us or other companies in our industry could harm our reputation. The potential physical impacts of climate change on our operations are highly uncertain, could be particular to the geographic circumstances in areas in which we operate and may include changes in rainfall and storm patterns and intensities, water shortages, changing sea levels, and changing temperatures. Extreme weather events, such as forest fires, severe storms, floods, drought or more extreme temperatures, all of which may be more frequent and more extreme due to climate change, may affect our operations. Our operations could be adversely affected in various ways, including through damage to our facilities or from increased costs for insurance. Such extreme weather events can also lead to community evacuations, temporary labour shortages, and delays in receiving critical supplies. Water will be a key resource for our operations and inadequate water management and stewardship could have a material adverse effect on our company and our operations. While certain aspects relating to water management are within our ability to control, extreme weather events, resulting in too much or too little water, can negatively impact our water management practices. The effects of climate change may adversely impact the cost, production, and financial performance of our operations.
- 17 -
Land reclamation requirements for our properties may be burdensome and expensive.
Although variable depending on location and the governing authority, land reclamation requirements are generally imposed on mineral exploration companies (as well as companies with mining operations) in order to minimize long term effects of land disturbance. Although variable depending on location and the governing authority, land reclamation requirements are generally imposed on mineral exploration companies (as well as companies with mining operations) in order to minimize long term effects of land disturbance.
Reclamation may include requirements to:
- control dispersion of potentially deleterious effluents;
- treat ground and surface water to drinking water standards; and
- reasonably re-establish pre-disturbance landforms and vegetation.
In order to carry out reclamation obligations imposed on us in connection with our potential development activities, we must allocate financial resources that might otherwise be spent on further exploration and development programs. - 17 - In order to carry out reclamation obligations imposed on us in connection with our potential development activities, we must allocate financial resources that might otherwise be spent on further exploration and development programs. We plan to set up a provision for our reclamation obligations on our properties, as appropriate, but this provision may not be adequate. If we are required to carry out unanticipated reclamation work, our financial position could be adversely affected.
We face intense competition in the mining industry. We face intense competition in the mining industry.
The mining industry is intensely competitive in all of its phases. The mining industry is intensely competitive in all of its phases. As a result of this competition, some of which is with large established mining companies with substantial capabilities and with greater financial and technical resources than ours, we may be unable to acquire additional properties, if any, or financing on terms we consider acceptable. We also compete with other mining companies in the recruitment and retention of qualified managerial and technical employees. If we are unable to successfully compete for qualified employees, our exploration and development programs may be slowed down or suspended. We compete with other companies that produce our planned commercial products for capital. If we are unable to raise sufficient capital, our exploration and development programs may be jeopardized or we may not be able to acquire, develop, or operate additional mining projects.
- 18 -
A shortage of equipment and supplies could adversely affect our ability to operate our business.
We are dependent on various supplies and equipment to carry out our mining exploration and, if warranted, development operations. We are dependent on various supplies and equipment to carry out our mining exploration and, if warranted, development operations. Any shortage of such supplies, equipment, and parts could have a material adverse effect on our ability to carry out our operations and could therefore limit, or increase the cost of, production.
Joint ventures and other partnerships, including offtake arrangements, may expose us to risks. Joint ventures and other partnerships, including offtake arrangements, may expose us to risks.
We may enter into joint ventures, partnership arrangements, or offtake agreements, with other parties in relation to the exploration, development, and production of the properties in which we have an interest. We may enter into joint ventures, partnership arrangements, or offtake agreements, with other parties in relation to the exploration, development, and production of the properties in which we have an interest. Any failure of such other companies to meet their obligations to us or to third parties, or any disputes with respect to the parties' respective rights and obligations, could have a material adverse effect on us, the development and production at our properties, including the I-M Mine Property, and on future joint ventures, if any, or their properties, and therefore could have a material adverse effect on our results of operations, financial performance, cash flows and the price of our common stock.
We may experience difficulty attracting and retaining qualified management to meet the needs of our anticipated growth, and the failure to manage our growth effectively could have a material adverse effect on our business and financial condition. We may experience difficulty attracting and retaining qualified management to meet the needs of our anticipated growth, and the failure to manage our growth effectively could have a material adverse effect on our business and financial condition.
We are dependent on a relatively small number of key employees, including our Chief Executive Officer and Chief Financial Officer. We are dependent on a relatively small number of key employees, including our Chief Executive Officer and Chief Financial Officer. The loss of any officer could have an adverse effect on us. We have no life insurance on any individual, and we may be unable to hire a suitable replacement for them on favorable terms, should that become necessary.
Our results of operations could be affected by currency fluctuations. Our results of operations could be affected by currency fluctuations.
Our properties are currently all located in the United States and, while most costs associated with these properties are paid in U.S. dollars, a significant amount of our administrative expenses are payable in Canadian dollars. There can be significant swings in the exchange rate between the U.S. dollar and the Canadian dollar. There are no plans at this time to hedge against any exchange rate fluctuations in currencies.
Title to our properties may be subject to other claims that could affect our property rights and claims. - 18 - Title to our properties may be subject to other claims that could affect our property rights and claims.
There are risks that title to our properties may be challenged or impugned. Our I-M Mine Property is located in California and may be subject to prior unrecorded agreements or transfers and title may be affected by undetected defects.
We may be unable to secure surface access or purchase required surface rights. We may be unable to secure surface access or purchase required surface rights.
Although we obtain the rights to some or all of the minerals in the ground subject to the mineral tenures that we acquire, or have the right to acquire, in some cases we may not acquire any rights to, or ownership of, the surface to the areas covered by such mineral tenures. Although we obtain the rights to some or all of the minerals in the ground subject to the mineral tenures that we acquire, or have the right to acquire, in some cases we may not acquire any rights to, or ownership of, the surface to the areas covered by such mineral tenures. In such cases, applicable mining laws usually provide for rights of access to the surface for the purpose of carrying on mining activities; however, the enforcement of such rights through the courts can be costly and time consuming. It is necessary to negotiate surface access or to purchase the surface rights if long-term access is required. There can be no guarantee that, despite having the right at law to carry on mining activities, we will be able to negotiate satisfactory agreements with any such existing landowners/occupiers for such access or purchase of such surface rights, and therefore we may be unable to carry out planned mining activities. In addition, in circumstances where such access is denied, or no agreement can be reached, we may need to rely on the assistance of local officials or the courts in such jurisdiction the outcomes of which cannot be predicted with any certainty. Our inability to secure surface access or purchase required surface rights could materially and adversely affect our timing, cost, or overall ability to develop any mineral deposits we may locate.
- 19 -
Our properties and operations may be subject to litigation or other claims.
From time to time our properties or operations may be subject to disputes that may result in litigation or other legal claims. From time to time our properties or operations may be subject to disputes that may result in litigation or other legal claims. We may be required to take countermeasures or defend against these claims, which will divert resources and management time from operations. The costs of these claims or adverse filings may have a material effect on our business and results of operations.
We do not currently insure against all the risks and hazards of mineral exploration, development, and mining operations. We do not currently insure against all the risks and hazards of mineral exploration, development, and mining operations.
Exploration, development, and mining operations involve various hazards, including environmental hazards, industrial accidents, metallurgical and other processing problems, unusual or unexpected rock formations, structural cave-ins or slides, flooding, fires, and periodic interruptions due to inclement or hazardous weather conditions. Exploration, development, and mining operations involve various hazards, including environmental hazards, industrial accidents, metallurgical and other processing problems, unusual or unexpected rock formations, structural cave-ins or slides, flooding, fires, and periodic interruptions due to inclement or hazardous weather conditions. These risks could result in damage to or destruction of mineral properties, facilities, or other property, personal injury, environmental damage, delays in operations, increased cost of operations, monetary losses, and possible legal liability. We may not be able to obtain insurance to cover these risks at economically feasible premiums or at all. We may elect not to insure where premium costs are disproportionate to our perception of the relevant risks. The payment of such insurance premiums and of such liabilities would reduce the funds available for exploration and production activities.
Risks Related to Our Common Stock
Our share price may be volatile and as a result you could lose all or part of your investment.
In addition to volatility associated with equity securities in general, the value of your investment could decline due to the impact of any of the following factors upon the market price of our common stock:
- Disappointing results from our exploration efforts;
- Decline in demand for our common stock;
- Downward revisions in securities analysts' estimates or changes in general market conditions;
- Technological innovations by competitors or in competing technologies;
- Investor perception of our industry or our prospects; and
- General economic trends.
Our share price on the CSE and the OTCQX has experienced significant price and volume fluctuations. Our share price on the CSE and the OTCQX has experienced significant price and volume fluctuations. Stock markets in general have experienced extreme price and volume fluctuations, and the market prices of securities have been highly volatile. These fluctuations are often unrelated to operating performance and may adversely affect the market price of the Shares. As a result, you may be unable to sell any Shares you acquire at a desired price.
- 20 -
We have never paid dividends on our common stock.
We have not paid dividends on our common stock to date, and we do not expect to pay dividends for the foreseeable future. We have not paid dividends on our common stock to date, and we do not expect to pay dividends for the foreseeable future. We intend to retain our initial earnings, if any, to finance our operations. Any future dividends on common stock will depend upon our earnings, our then-existing financial requirements, and other factors, and will be at the discretion of the Board.
Investors' interests in our company will be diluted and investors may suffer dilution in their net book value per share of common stock if we issue additional employee/director/consultant options or if we sell additional common stock and/or warrants to finance our operations. Investors' interests in our company will be diluted and investors may suffer dilution in their net book value per share of common stock if we issue additional employee/director/consultant options or if we sell additional common stock and/or warrants to finance our operations.
In order to further expand our operations and meet our objectives, any additional growth and/or expanded exploration activity will likely need to be financed through sale of and issuance of additional common stock, including, but not limited to, raising funds to explore the I-M Mine Property. In order to further expand our operations and meet our objectives, any additional growth and/or expanded exploration activity will likely need to be financed through sale of and issuance of additional common stock, including, but not limited to, raising funds to explore the I-M Mine Property. Furthermore, to finance any acquisition activity, should that activity be properly approved, and depending on the outcome of our exploration programs, we likely will also need to issue additional common stock to finance future acquisitions, growth, and/or additional exploration programs of any or all of our projects or to acquire additional properties. We will also in the future grant to some or all of our directors, officers, and key employees and/or consultants options to purchase common stock as non-cash incentives. The issuance of any equity securities could, and the issuance of any additional common stock will, cause our existing stockholders to experience dilution of their ownership interests.
If we issue additional common stock or decide to enter into joint ventures with other parties in order to raise financing through the sale of equity securities, investors' interests in our company will be diluted and investors may suffer dilution in their net book value per share of common stock depending on the price at which such securities are sold. If we issue additional common stock or decide to enter into joint ventures with other parties in order to raise financing through the sale of equity securities, investors' interests in our company will be diluted and investors may suffer dilution in their net book value per share of common stock depending on the price at which such securities are sold.
The issuance of additional shares of common stock may negatively impact the trading price of our securities. - 20 - The issuance of additional shares of common stock may negatively impact the trading price of our securities.
We have issued common stock in the past and will continue to issue common stock to finance our activities in the future. We have issued common stock in the past and will continue to issue common stock to finance our activities in the future. In addition, newly issued or outstanding options, warrants, and broker warrants to purchase common stock may be exercised, resulting in the issuance of additional common stock. Any such issuance of additional common stock would result in dilution to our stockholders, and even the perception that such an issuance may occur could have a negative impact on the trading price of the common stock.
We are subject to the continued listing criteria of the CSE, and our failure to satisfy these criteria may result in delisting of our common stock from the CSE. We are subject to the continued listing criteria of the CSE, and our failure to satisfy these criteria may result in delisting of our common stock from the CSE.
Our common stock is currently listed for trading on the CSE. Our common stock is currently listed for trading on the CSE. In order to maintain the listing on the CSE or any other securities exchange we may trade on, we must maintain certain financial and share distribution targets, including maintaining a minimum number of public shareholders. In addition to objective standards, these exchanges may delist the securities of any issuer if, in the exchange's opinion, our financial condition and/or operating results appear unsatisfactory; if it appears that the extent of public distribution or the aggregate market value of the security has become so reduced as to make continued listing inadvisable; if we sell or dispose of our principal operating assets or cease to be an operating company; if we fail to comply with the listing requirements; or if any other event occurs or any condition exists which, in their opinion, makes continued listing on the exchange inadvisable.
- 21 -
If the CSE or any other exchange or market were to delist the common stock, investors may face material adverse consequences, including, but not limited to, a lack of trading market for the common stock, reduced liquidity, decreased analyst coverage, and/or an inability for us to obtain additional financing to fund our operations.
Item 1B. Unresolved Staff Comments
None.
Item 1C.Item 1A. Cybersecurity
Risk Management and Strategy
We have policies and processes for assessing, identifying, and managing material risk from cybersecurity threats and have integrated these processes into our overall risk management systems and processes. We assess material risks from cybersecurity threats, including any potential unauthorized occurrence on or conducted through our information systems that may result in adverse effects on the confidentiality, integrity, or availability of our information systems or any information residing therein.
We conduct periodic risk assessments to identify cybersecurity threats, as well as assessments in the event of a material change in our business practices that may affect information systems that are vulnerable to such cybersecurity threats. These risk assessments include identification of reasonably foreseeable internal and external risks, the likelihood and potential damage that could result from such risks, and the sufficiency of existing policies, procedures, systems, and safeguards in place to manage such risks.
Governance
One of the key functions of our Board of Directors is informed oversight of our risk management process, including risks from cybersecurity threats. Our Board is responsible for monitoring and assessing strategic risk exposure, and management is responsible for the day-to-day management of any material risks that may arise. We do not believe that there are currently any known risks from cybersecurity threats that are reasonably likely to materially affect us or our business strategy, results of operations, or financial condition.
Cybersecurity Threats
As of July 31, 2024, we have not identified an indication of a cybersecurity incident that would have a material impact on our business and consolidated financial statements. For further discussion of cybersecurity risks, please refer to Item 1A. Risk Factors.
Recently Filed
Ticker * | File Date |
---|---|
CMTL | 1 day, 4 hours ago |
SLP | 1 day, 5 hours ago |
PSMT | 1 day, 5 hours ago |
RYES | 2 days, 4 hours ago |
PURE | 2 days, 4 hours ago |
ENZ | 2 days, 4 hours ago |
FDS | 2 days, 4 hours ago |
CLEV | 2 days, 4 hours ago |
PCNT | 2 days, 4 hours ago |
ZDGE | 2 days, 5 hours ago |
HFUS | 2 days, 5 hours ago |
SMPL | 2 days, 6 hours ago |
NMEX | 2 days, 6 hours ago |
JRVS | 2 days, 7 hours ago |
HITC | 2 days, 12 hours ago |
BCTX | 3 days, 3 hours ago |
JBL | 3 days, 4 hours ago |
AZO | 3 days, 4 hours ago |
AYI | 3 days, 5 hours ago |
PCYN | 6 days, 4 hours ago |
NIMU | 6 days, 4 hours ago |
HRBR | 1 week ago |
SGH | 1 week ago |
LNN | 1 week ago |
GBX | 1 week ago |
MSM | 1 week ago |
SCHN | 1 week ago |
IIIN | 1 week ago |
MAYS | 1 week ago |
WGO | 1 week, 1 day ago |
VIVC | 1 week, 1 day ago |
CIIT | 1 week, 2 days ago |
NXEN | 1 week, 2 days ago |
WOLV | 1 week, 6 days ago |
UNQL | 2 weeks ago |
CMC | 2 weeks ago |
VRDR | 2 weeks, 1 day ago |
SGLY | 2 weeks, 2 days ago |
FRST | 2 weeks, 2 days ago |
AWYS | 2 weeks, 6 days ago |
GHST | 2 weeks, 6 days ago |
SHMY | 2 weeks, 6 days ago |
ENOB | 3 weeks ago |
ODC | 3 weeks ago |
PAXH | 3 weeks ago |
VRTC | 3 weeks ago |
ACN | 3 weeks ago |
VLGEA | 3 weeks, 1 day ago |
CZNI | 3 weeks, 1 day ago |
ALDS | 3 weeks, 1 day ago |